Every client has heard the handover horror stories: a long snag list, months of chasing, finishes replaced after move-in. A clean handover is not luck. It is built in from the first week.
The cheapest time to catch a problem is before it is covered up. Work is checked at each stage — before a wall closes over an installation, before tiling goes over waterproofing, before paint goes over filler — so faults are fixed while they are still easy to reach.
When every trade sits under one contract, there is nobody to pass the snag to. The same team that built it closes it, which is why single-contractor projects tend to hand over cleaner than ones stitched together from separate trades.
Snags closed before handover is not a slogan for us — it is how the programme is run. You take the keys to finished work, not to a list of things still to do.