Most villa refurbishment budgets go wrong in the same place: the headline number is set before anyone has priced the work line by line. Here is how a full refurbishment actually breaks down.
Every villa is different, but the proportions are surprisingly consistent. On a typical four- to five-bedroom villa refurbishment in Dubai, the spend tends to land in these bands.
Removing old finishes, redundant partitions, dated joinery and failed waterproofing is rarely glamorous, but skipping a proper strip-out is the most common reason a project overruns later. Budget for honest demolition, waste removal to an approved tip, and the making-good that always follows.
Waterproofing to wet areas, correct substrate preparation before tiling, and AC capacity for a reconfigured layout are the three items most often value-engineered out early and paid for twice later. We price them in from the start because they are not optional.
Askano prices refurbishments from measured quantities, not a round figure per square foot. You get a line-by-line breakdown you can interrogate, a sequence that is realistic, and a handover date we can actually hold. If you are weighing up a villa project, send us the drawings and we will tell you honestly what it takes.